Cherry Hills Village

HPM completed the redevelopment of John Meade Park, the main park in Cherry Hills Village. They exceeded our expectations, communicating well throughout the project and offering effective and low-cost solutions to any issues that came up during construction. For example, constructing a boardwalk through the wetland led to some surprising discoveries and the original building plan turned out to be unfeasible. HPM smoothly transitioned to a new plan, working with the engineer to field design a spread footer based on actual soil conditions, completing the work with no cost increase. The HPM team also went above and beyond to adjust the schedule so that we could remove fish from the ponds prior to dredging. Their sensitivity to the park’s riparian areas and wildlife habitat was very appreciated. Working with HPM was an excellent experience that made our park project a great success!